Dr. Daniel Tonke

PhD student

 


Research interests

  • Robotic cell scheduling
  • Semiconductor industries

Education

09/2008 – 07/2010

M.Sc. Industrial and Systems Engineering.
Korean Advanced Institute of Science and Technology, South Korea.

10/2005 – 10/2011

Dipl.-Ing Wirtschaftsingenieurwesen (Maschinenbau).
Technische Universität Berlin, Germany. 


Publications

  • Tonke, D.; Grunow, M.; Akkerman, R.: Robotic-cell scheduling with pick-up constraints and uncertain processing times. IISE Transactions 51 (11), 2019, 1217-1235 mehr…
  • Tonke, D.; Grunow, M.: Maintenance, shutdown, and production scheduling in semiconductor robotic cells. International Journal of Production Research 56 (9), 2018, 3306–3325 mehr…
  • Tonke, D.; Lee, T.-E.: Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms. IEEE Transactions on Automation Science and Engineering 13 (2), 2016, 1176 - 1188 mehr…
  • Meiler, M.; Tonke, D.; Grunow, M.; Günther, H.-O.: Pattern-based supply network planning in the pharmaceutical industry. Computers & Chemical Engineering 77, 2015, 43-58 mehr…
  • Tonke, D.; Lee, T. E.: Scheduling of a dual-armed cluster tool with two independent robot arms. IEEE International Conference on Automation Science and Engineering, 2012Seoul, South Korea, 200-205 mehr…